Finish Editing
Save
Undo
Clear
Agency
: Bangalore Metro Rail Corporation Limited
Budget
: NA
Estimated time
: 2.5 years
Start date
: 01-05-2017
End date
: 09-08-2019
Description
The signal-free corridor project for redeveloping the Central Silk Board intersection, to be built along the Metro corridor from Ragigudda to Silk Board, was to be built in two-and-a-half years. This was expected to cut down travel time of motorists, who currently spend more than 20 minutes to cross the junction. The elevated road also offered direct access towards Electronic City, BTM Layout, Marathahalli and HSR Layout without having to wait at the traffic lights.
The signal-free corridor project, to be built along the Metro corridor from Ragigudda to Silk Board, was to be built in two-and-a-half years. This was expected to cut down travel time of motorists, who currently spend more than 20 minutes to cross the junction. The elevated road also offered direct access towards Electronic City, BTM Layout, Marathahalli and HSR Layout without having to wait at the traffic lights.
The signal-free corridor project, to be built along the Metro corridor from Ragigudda to Silk Board, was to be built in two-and-a-half years. This was expected to cut down travel time of motorists, who currently spend more than 20 minutes to cross the junction. The elevated road also offered direct access towards Electronic City, BTM Layout, Marathahalli and HSR Layout without having to wait at the traffic lights.