Wards
+
ISSUES
-
Power was gone at around 9 pm and no power till 12.30 pm when tried to call 1912 line is busy all the time..
-
loss of green area and natural habitat24 Aug, 2014loss of green area and natural habitatBruhat Bangalore Mahanagara PalikeEnvironment & Public SpacesUnderstand that skyscrapers are going to come in what seems to be the only remaining green patch near jalahalli cross on SM road at what is seen as coconut grove on google map. Can citizens stop such monstrous conversion of natural habitat to unsustainable concrete ?
-
A non existing road, used by thousands..20 Jan, 2014A non existing road, used by thousands..Bruhat Bangalore Mahanagara PalikeRoads, Traffic & TransportThe only alternate road available to the employees of Peenya and other industrial area in this location is from CMTI to the HMT theater. But, about three years ago, BWSSB dug up this entire stretch. In each day tens of thousands of vehicles are plying in this road. But, BWSSB never put back this road in the original condition.
Recently, there was huge pampering that this road is going to be 4 lane road and they started the work.. but, now that also is stopped.
Besides, recently, once again BWSSB dug up all roads in the Jalahalli village and some of the arterial roads.. but once again left them..
It is requested to make these roads motorable. -
Voter ID no. REJ5806211 Missing in Ward No 1605 May, 2013Voter ID no. REJ5806211 Missing in Ward No 16Bruhat Bangalore Mahanagara PalikeCity AmenitiesVoter Miss Pavithra Srinivasan bearing Voter id No. REJ5806211 is missing in the list of New Voters Added in Raja Rajeswarinagar Constituency, in Ward No 16.
Please do the needful.
Regards
Pavithra -
Sewage Line blockage25 Mar, 2013Sewage Line blockageBangalore Water Supply and Sewage BoardHealth & SanitationDear Sir,
We are facing a problem in Sewage line problem , Please do the needful ASAP
Thanking you
Venugopal M
9945270678 -
Improper waste segregation in ISRO Quaters21 Mar, 2013Improper waste segregation in ISRO QuatersBangalore Water Supply and Sewage BoardHealth & SanitationIn ISRO colony there is improper waste segregation. Only wet waste and dry waste bins are marked and no collection bins for sanitary waste and hazardous waste (electronic items etc). Also there is no proper attention given by local residents' association and it has slack attitude. Waste segregation of dry and wet waste not being done properly. Ward representative and BBMP should apply pressure on resident association to take proper steps for waste segregation.
-
No bus service for 5.6 kms in the ward31 Jan, 2013No bus service for 5.6 kms in the wardBangalore Metropolitan Transport CorporationRoads, Traffic & Transport22-Jan-13
Sub: Request for Bus Route Deviation in Jalahilli
I am a student and have moved to Bangalore 3 months back. I live in an area completely unserved by the BMTC bus network. My housing complex is 200 steps from Platinum City and National Institute of Design (R&D) campus. The entire stretch of road starting from where the service road touches the Tumkur Road right up till the HMT Ground (next to the HMT Theatre) is not covered by any bus route.
I don’t have any issues with walking but most parts of the road are broken and dusty on this stretch. Also, there is no clear footpath running along on this path making walking on this 2-lane road slightly dangerous.
Ramifications in such a scenario
1. 1. The occupants of the housing societies in this area are forced to purchase a vehicle of their own. While this constrains the pockets of the citizens in this area, the larger issue is that the action cumulatively adds to the city traffic problem.
2. 2. It is extremely unsafe for women walking/cycling/travelling on this stretch.
I will be happy to help you with any more information that you need to resolve this issue for the residents here.
Yours Sincerely
Aman Trehan
(Resident of Jalvayu Heights)
Encl.
1. Google Image for the area under discussion to approximate distance
2. Hand-drawn Route information to show ground detail of number of settlements
-
Street light not working04 Aug, 2012Street light not workingBruhat Bangalore Mahanagara PalikeCity AmenitiesThe street lights in front of the Anganwaadi are not functioning from last 2 weeks. It was informed to the BESCOM people but it was rejected saying the street light topic comes under some contractor and he has to be convinced to repair the street lights.
There is a junction at this point where 3 roads meet (Road from HMT and other going towards Kempegowda Kalyanamantappa). Due to darkness in night it is difficult to ride vehicle. It is dangerous and may lead to accident.
PROJECTS - see all -
+
RWA CENTRAL - see all -
-
Jalahalli
-
Jalahalli
PROPERTY TAX