Wards
Marathahalli
true
No have been added so far, click here to add the first one.
+
New Request
0.0
    Representative
    Ramesh (Independent)
    Elected in Year
    2015
    Category
    General
    Voters (2011)
    22489
    Area
    3.1 sq. km
    Assembly Consitituency
    Mahadevpura
    Parliamentary Consitituency
    Bangalore Central
    Localities
    Click to see
+
Issues icon
ISSUES
  • More Buses Please: From Byadarahalli (Towards Sunkadakatte) To CS-Marathahalli Bridge (Towards Varthur)
    21 Jan, 2019
  • More Buses Please: From Swamy Vivekananda Metro Station (Towards Departure) To Yamalur (Towards HAL)
    23 May, 2018
  • More Buses Please: From Abbaiah Layout (Towards Abbaiah Layout) To Marathahalli Bridge (Towards Varthuru)
    30 Mar, 2018
  • More Buses Please: From 19th Main 13th Cross HSR Layout (Towards Parangipalya) To Marathahalli Bridge (Towards Kempegowda Bus Station)
    19 Mar, 2018
  • More Buses Please: From Marathahalli Bridge (Towards Kempegowda Bus Station) To Bagmane Tech Park (Towards CV Raman Nagara)
    09 Mar, 2018
  • More Buses Please: From Marathahalli Bridge Flyover (Towards Varthuru) To CS-Hoodi (Towards ITPL)
    27 Feb, 2018
  • More Buses Please: From Balagere (Towards Varthuru) To Marathahalli (Towards Domlur)
    23 Nov, 2017
  • More Buses Please: From Balagere (Towards Panaturu) To Marathahalli (Towards Domlur)
    13 Nov, 2017
  • Potholes [Heavy damage] on Dental college road, Marathalli
    29 Jul, 2016
  • Water logging in Karthik nagar
    07 Jun, 2016
  • Frequent Pwoer cuts
    12 Apr, 2016
  • Frequent power cuts
    06 Feb, 2016
  • Frequent power cuts at ashwath nagar , marathalli
    13 Jan, 2016
  • Terrible shameful roads
    17 Nov, 2015
  • No power from 9 am
    30 Oct, 2015
  • Never ending powercuts in 1st Cross Ashwath Nagar,Marathalli
    14 Oct, 2015
  • Marathahalli near Thulasi theater road very long power cuts
    09 Sep, 2015
  • long power cuts in marathahalli ckb layout
    10 Jun, 2015
  • long and frequent powercut in marathalli
    23 May, 2015
  • Power Shortage in Marathahalli
    26 Apr, 2015
  • Frequent Power Cuts
    19 Mar, 2015
  • No proper garbage collection in munekolala area
    09 Mar, 2015
  • Drainage overflow on the service road Aswath Nagar
    31 Jan, 2015
  • Need concrete road
    01 Nov, 2014
  • Deplorable to No Roads in Marathalli/Munnekolala
    15 Sep, 2014
  • Frequent & Multiple Power Cuts in Marathalli/Munnekoala
    15 Sep, 2014
  • tulasi theatre road in a pathetic condition
    16 Jun, 2014
  • Cement Factories in Chinnapanahalli Residential Area
    19 Apr, 2014
  • no cleaning happening on marathalli service road
    20 Mar, 2014
  • No drainage system at hemanth nagar marathalli
    20 Mar, 2014
  • Abusive behaviour by water tanker vehicle
    03 Mar, 2014
  • Are the speed breakers is the only way to control the speed ??
    04 Feb, 2014
  • Pathetic Condition of Roads
    23 Oct, 2013
  • 3A CROSS, PR LAYOUT, MARATHAHALLI EXTENSION, ROAD CONDITIONS
    29 Aug, 2013
  • Stray dogs in kundhalahalli.
    17 Jul, 2013
  • No pedestrian crossing near Prestige Tech Park
    21 Jun, 2013
  • Request for foot over bridge
    02 Jun, 2013
  • Please repair the Road
    21 May, 2013
  • Potholes on Munnekolal Main Road (Marathahalli)
    21 May, 2013
  • Water Over Flowing on the Electric Poll in Ashwathnagar 8th Cross.
    02 May, 2013
  • No cauvery water
    02 May, 2013
  • No street lights on Whitefield roads
    16 Apr, 2013
  • Restrict heavy vehicles from Chinnapanahalli Road Railway Crossing, which get stuck causing traffic jams
    10 Apr, 2013
  • Garbage not collected regularly
    04 Apr, 2013
  • road encroachment
    28 Mar, 2013
  • Garbage lying everywhere
    12 Mar, 2013
  • Open drains issue due to delayed UGD
    13 Feb, 2013
  • Auto Rickshaw's Charge High
    14 Jan, 2013
  • Road Condition is Very bad in Munnekolalu Extension area
    12 Jan, 2013
  • Water Problem
    06 Nov, 2012

PROJECTS - see all -

PROPERTY TAX